|
Pre-Flight Check List Done One Day Before Launch.
1. ____Unload the Rocket and inspect for any damage that may had occurred during transportation to LDRS.
2. _____Verify that all of the needed equipment is in hand.
Flight Day Check List Done the morning of the flight
1. ____ Assemble the motor per manufacture instruction.
2. ____Double Check motor assembly for no missing pieces and everything is secure.
3. ____ Assemble the Main Pyro. Charges
4. ____ Assemble the Drogue Pyro. Charges
5. ____ Remove Electronics from payload section.
6. ____ Check all wiring for lose or broken connections.
7. ____ Check voltage on two new 9 volt batteries.
8. ____ Install and secure two 9 volt batteries on the sled.
9. ____ Test both altimeters.
10. ____ Verify the settings on both altimeters.
11. ____ Double check power switches are off. Reinstall Recovery electronics
12. ____ Install the Main Pyro. Charges
13. ____ Install The Drogue Pyro. Charges
14. ____ Secure Electronic sled in the electronic bay.
15. ____ Close up the Electronic bay.
16. ____ Check for continuity on both Pyro Charges.
17. ____ Attach the main recovery shock cord to the U bolt on the forward bulk head.
18. ____ Attach the main body tube to electronic bay and secure with screws.
19. ____ Attach the Nomex pad to shock cord.
20. ____ Attach the main shock cord to the nosecone
21. ____ Pack the main parachute.
22. ____ Attach the main parachute to the shock cord.
23. ____ place the main parachute in the main body tube.
24. ____ Place nosecone on the body tube and secure with shear pins.
25. ____ Attach drogue shock cord to the aft end of the electronic bay.
26. ____ Attach the drogue body tube to the electronics bay and secure with screws.
27. ____ Attach the drogue shock cord to the bulkhead on the booster section.
28. ____ Pack drougue parachute.
29. ____attachNomex pad
30. ____ attach Drougue parachute to shock cord.
31. ____ connect the booster to the drogue section of body tube.
32. ____ secure with shear pins.
33. ____ Install the Motor into the booster.
34. ____ Secure Motor in place with clips and screws.
35. ____ Fill out flight card, get pad assignment.
36. ____ Take rocket out to the pads.
37. ____ Load rocket on the launch rail.
38. ____ Install ignitor.
39. ____ Arm both altimeters.
40. ____ Verify the correct beep patterns.
41. ____ Take pictures.
42. ____ Request LCO launch rocket.
43. ____ Go recover rocket.
44. ____ Get Level 3 paperwork signed.
45. ____ Party!
|